JGM were involved in the fit out and installation of the new Scania Falkirk development. This involved a full M&E Installation for the new build, as well as Fire & Security installation.
JGM are proud to have been involved with delivering the Full Mechanical and Electrical services to a large scale facility on a site of 4.77 acres. The fully de-carbonised building incorporates state-of-the-art sustainable design features including Solar PV, Air Source Heat Pump and underfloor heating and full LED energy saving lighting utilising daylight harvesting to reduce energy consumption.
This project involved the installation of all Fire & Security systems as well as Cabling from the External Electrical Enclosure to all areas of the new building. This development included multiple changing rooms and WCs, as well as Disabled WC with alarm installation. It also included a canteen kitchen, reception area, comms room and fully fitted warehouse.