Case Studies

Scania Falkirk

Our Mission

JGM were involved in the fit out and installation of the new Scania Falkirk development. This involved a full M&E Installation for the new build, as well as Fire & Security installation.

JGM are proud to have been involved with delivering the Full Mechanical and Electrical services to a large scale facility on a site of 4.77 acres. The fully de-carbonised building incorporates state-of-the-art sustainable design features including Solar PV, Air Source Heat Pump and underfloor heating and full LED energy saving lighting utilising daylight harvesting to reduce energy consumption.

This project involved the installation of all Fire & Security systems as well as Cabling from the External Electrical Enclosure to all areas of the new building. This development included multiple changing rooms and WCs, as well as Disabled WC with alarm installation. It also included a canteen kitchen, reception area, comms room and fully fitted warehouse.

Client Scania Falkirk Principal Contractor CM Steel
Duration 45
Weeks
Value £1.2
Million

Fire & Security

Full L1 fire alarm system was installed throughout the building with 24/7 monitoring via the alarm receiving centre. Emergency voice communication system was also installed to allows firefighters & others to communicate with one & other during emergency situations.

Accessible toilet alarms were installed to provide assistance if required in an emergency situation along with an Intruder Alarm system throughout the building, covering all areas, to prevent unwanted intrusion within the building. The system is monitored 24/7 via the alarm receiving centre. CCTV System cameras have been installed internally & externally throughout the building with all cameras recording 24/7, 365 days and all images can be reviewed within the building.

Access control was installed within the main building with key fob access into certain areas & access control was also incorporated within the barrier system which allows communication between the barrier system at the main entrance & the main reception desk. Public address & voice alarm system were also installed within the workshops & can be used for communication between the reception & workshop areas. This system can also allow a safe & controlled building evacuation to be managed in the case of an emergency.

Full Mechanical & Electrical Installation Package

JGM North M&E Scania Falkirk JGM are proud to have been involved with delivering the Full Mechanical and Electrical services to a facility which extends to 22,244 sq ft (2,066.47 sq m) on a site of 4.77 acres, the fully de-carbonised building incorporates state-of-the-art sustainable design features including Solar PV, Air Source Heat Pump and underfloor heating and full LED energy saving lighting utilising daylight harvesting to reduce energy consumption.

The results

The Scania team settled quickly into their new accommodation and the project was successfully carried out in full. We’re very proud to have been involved in this large scale, new build project and ensuring the safety and security of the building and all its occupants.