Heriot-Watt University: James Nasmyth Building

Our Mission

The project involved the stripping out of the existing internal services, with the fit out MEP feeds provided from the existing infrastructure.
The Universities protocols and installation procedures were fully applied to the project, with a successful delivery. The heavily serviced installation required detailed co-ordination, set against the restricted space parameters. This was successfully undertaken by JGM. The services testing, commissioning and hand over exercises were managed and controlled by JGM.

Client Heriot Watt University Principal Contractor SJS
Duration 4
Months
Value £158
Thousand

Electrical

  • Strip out of existing internal services, within a live building.
  • Coordinate installation drawing exercises.
  • Electrical services feeds from existing main and sub main power. Installation of new distribution boards.
  • Installation of surface and recessed containment for electrical and data services.
  • Installation of new lighting, power and control arrangements.
  • Installation of new fire alarm networks, interfaces, and specialist services.
  • IT networks and fume cupboard fit out requirements.
  • Phased installation and hand over.

Mechanical

  • Strip out of existing internal services, within a live building.
  • Coordinate installation drawing exercises.
  • Installation of new heating, cooling systems and controls.
  • Hot, cold and public health installations.
  • Fume cupboard fit out requirements.
  • Installation of ventilation primary and secondary networks.
  • Compressed air, vacumme and laboratory gas works.
  • Core services riser installation.
  • BMS and specialist control networks.
  • Phased installation and hand over.

The results

  • A heavily serviced, coordinated project, completed in a phased manner.
  • Restricted, though successful working exercises, as the existing building was a live working environment.
  • Excellent client liaison due to the complexity of working within a live building environment.

Handover of the services, including the commissioning and demonstration of the working installation, completed to the Heriot Watt protocols, on programme and to budget.