Kenneth MacKenzie Hotel

Our Mission

To successfully execute the refurbishment of this modern and sophisticated 45 double en-suite room hotel within time, budget and to a very high quality standard. This project comprised of difficult challenges which had to be overcome such as; City Centre logistics management and complex service coordination to maximise bedroom ceiling heights. Furthermore, the adjacent student accommodation block was occupied and had to remain functional, despite having a communal Plantroom servicing both properties.

Client University of Edinburgh Principal Contractor Central Building Contractors Ltd
Duration 20
Weeks
Value £1
Million

Electrical

  • Isolations and temporary diversions of existing live services.
  • New internal & external LED Lighting.
  • New fire alarm system.
  • Installation of data services.
  • Installation of bespoke lighting to Common Room Area.
  • New access control, intruder alarm & CCTV Systems.
  • New aerial installation.

Mechanical

  • Isolations and temporary diversions of existing live services.
  • Production of fully coordinated M&E Services drawings.
  • Design development and operational delivery of CDP Items.
  • Installation of new low pressure water mist sprinkler system.
  • Alterations to existing public health systems.
  • Installation of new sanitary appliances, brassware and showers.
  • Coordination & Installation of new ventilation systems.
  • Commissioning management.
  • Rebalancing of existing systems and testing and commissioning of new HVAC Systems.

The results

Our client successfully achieved their objective of refurbishing this outdated property to a high quality standard, on time and within budget.

Their asset comprises of a well-designed, coordinated and commissioned building services installation, which delivers an economical solution in terms of lifecycle costs.

We received excellent feedback on our open and collaborative approach and also on the quality of our workmanship consequently, we have since secured another project with this client.

The hotel occupancy is currently flourishing and has been well received by members of the public and tourists and subsequently continues to receive very good reviews.