Glentress Estate

Our Mission

In 2022 JGM were tasked with upgrading Forestry and Land Scotland’s District Heating systems across the Glentress Estate. This upgraded District Heating solution would replace existing biomass heating and would set Glentress on the road to 5th Generation District Heating.

Client Forestry Land Scotland Principal Contractor JGM
Duration 6
Months
Value £570
Thousand

Mechanical

With support from McDonald Water Storage, a new and innovative in-line domestic hot water heater was developed to meet the specific requirements of the Office building. More traditional pressurised storage was used for the café and a vented high capacity thermal store used for the showers; which allowed for high instantaneous flow rates without excess stored potable water during off-peak times.

The results

JGM have delivered a complex district ASHP replacement scheme following the failing of the existing biomass boiler system.

More case studies

Key sectors

Connecting with our clients for success.
Contact Us

Our Accreditations